INSTALLATION & OPERATING GUIDESINGLE® GPR DBC-DVWITH SMART FUNNEL®Dual Voltage ModelBUNN-O-MATIC CORPORATIONPOST OFFICE BOX 3227SPRINGFIELD, ILLIN
Page 237994 051910INTRODUCTIONThe brewer incorporates a wireless interface system that allows the DBC Grinder to load certain information into the &qu
Page 300656.000100986.000000658.000020201.5600WARNING• DO NOT OVERLOAD CIRCUIT.• ALWAYS ELECTRICALLY GROUND THE CHASSIS.• DO NOT DEFORM PLUG OR CORD.
Page 4WHITE/VIOLETBLUEWHITEBACKFRONT120/208V120/240V120VELECTRICAL HOOK-UPCAUTION: Improper electrical installation will damage electronic components.
Page 5PLUMBING REQUIREMENTSThis brewer must be connected to a cold water system with operating pressure between 20 and 90 psi (138 and 620 kPa) from a
Page 6ON / OFFOPERATING CONTROLS OPERATING CONTROLS (a) MAIN ON/OFF SWITCH This switch, located under the brewer behind the right front leg, turns po
Page 7COFFEE BREWING1. Select the desired batch size on the grinder. It is not necessary to select a size on the brewer.2. Insert a BUNN filter into
Komentarze do niniejszej Instrukcji