Bunn TB3Q-LP Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Ekspresy do kawy Bunn TB3Q-LP. Bunn TB3Q-LP User's Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - BUNN-O-MATIC CORPORATION

TB3QTB3Q-LPOPERATING & SERVICE MANUALBUNN-O-MATIC CORPORATIONPOST OFFICE BOX 3227SPRINGFIELD, ILLINOIS 62708-3227PHONE: (217) 529-6601 FAX: (21

Strona 2 - INTRODUCTION

Page 10TROUBLESHOOTINGA troubleshooting guide is provided to suggest probable causes and remedies for the most likely problemsencountered. If the pro

Strona 3 - SWEETENER

Page 11TROUBLESHOOTING (cont.)PROBLEMPROBABLE CAUSEREMEDYBrew cycle will not start (cont.)Water is not hotDilution cycle will not startInconsistent be

Strona 4 - PLUMBING REQUIREMENTS

Page 12TROUBLESHOOTING (cont.)PROBLEMPROBABLE CAUSEREMEDYConsistently high or low beveragelevel in the dispenserSpitting or excessive steamingDrip-out

Strona 5 - INITIAL SET-UP

Page 13TROUBLESHOOTING (cont.)PROBLEMDripping from sprayheadWater flows into tank continuously(ON/OFF Switch "ON")(UNSWEET/OFF/SWEET Switch

Strona 6 - AUTO SWEETENER SET-UP

Page 14TROUBLESHOOTING (cont.)PROBLEMWeak beverage (cont.)Dry tea leaves remain in the funnelBrewer is making unusual noisesPROBABLE CAUSE4. Funnel Lo

Strona 7 - ADJUSTING BREW VOLUMES

Page 15SERVICEThis section provides procedures for testing andreplacing various major components used in thisbrewer should service become necessary.

Strona 8 - AUTO SWEETENER CLEANING

Page 16SERVICE (cont.)BREW SOLENOID VALVEFIG. 2 BREW SOLENOID VALVEP3046Location:Viewing the brewer from the top, the brew sole-noid valve is mounted

Strona 9 - TEA BREWING

Page 17SERVICE (cont.)DIGITAL BREW TIMERFIG. 4 DIGITAL BREW TIMERP3047Location:The timer is located inside the hood, on the leftside.Test Procedure.NO

Strona 10 - Service

Page 18SERVICE (cont.)TL1 - WHI to Power Cord (100V & 120V) or RED to Power Connector (230V) and WHI to On/Off Switch (100V &

Strona 11 - 37236 050305

Page 19SERVICE (cont.)CONTROL THERMOSTATFIG. 6 CONTROL THERMOSTATP3047Location: The control thermostat is located inside hood onthe right side.Test Pr

Strona 12

Page 2CONTENTSUser Notices ...3Electrical & Plumbing Requirements ...

Strona 13 - Service

Page 20SERVICE (cont.)LIMIT THERMOSTATFIG. 8 LIMIT THERMOSTATP3047Location:The limit thermostat is located inside the hood onthe tank lid.Test Procedu

Strona 14

Page 21SERVICE (cont.)ON/OFF SWITCHFIG. 10 ON/OFF SWITCHP3034Location:The ON/OFF switch is located in the front of thehood, above and to the left of t

Strona 15 - Troubleshooting

Page 22If continuity is present as described, reconnect thewires, the switch is operating properly.If continuity is not present as described, replace

Strona 16 - Diagrams

Page 23FIG.15 UNSWEET/OFF/SWEETSWITCH TERMINALSP176337236 050305SERVICE (cont.)UNSWEET/OFF/SWEET SWITCH (Sweetner Option)FIG. 14 UNSWEET/OFF/SWEET SWI

Strona 17 - 37236 080504

Page 2437236 050305SERVICE (cont.)SWEETNER SOLENOID VALVEFIG. 16 SWEETNER SOLENOID VALVEP3298FIG. 17 SOLENOID VALVE TERMINALSP2843WHI/VIO to Brew Sole

Strona 18

Page 25SERVICE (cont.)TANK HEATERFIG. 18 TANK HEATERLocation:The tank heater is located inside the tank and se-cured to the tank lid.Test Procedures:1

Strona 19 - Thermal Fuse (230V)

Page 26LIMITTHERMOSTATBLU/BLKTANK HEATER"KEEP WARM" HEATERSTARTL1NBLKWHIBLKBREWTIMERWHIWHIGREENWHI/YELWHI/ORABLKWHI/GRNWHI/VIOWHIBRN/WHIWHI/

Strona 20 - Power Connector

Page 2737236 050305SCHEMATIC WIRING DIAGRAMTB3QALIMITTHERMOSTATSW1BREWTIMERBLK BLKBLKBLU/BLK REDREDREDWHI WHIWHI/VIOWHI/VIOWHI/GRNWHI/GRNWHI/ORNL1L2GR

Strona 21

Page 3WARNING!Fill water tank before turning - on - thermostat or connecting applianceto power source.Use only on a properly protectedcircuit capable

Strona 22 - Timer TL3

Page 4ELECTRICAL REQUIREMENTSCAUTION - The brewer must be disconnected from the power source until specified in Initial Set-Up.120V model brewers requ

Strona 23

Page 5INITIAL SET-UPCAUTION - The brewer must be disconnected from the power source throughout the Initial Set-Up, exceptwhen specified in the instruc

Strona 24 - BRN/WHI to Selector

Page 637236 050305AUTO SWEETENER SET-UPCAUTION - The brewer must be disconnected from the power source throughout the Initial Set-Up, exceptwhen speci

Strona 25 - Wiring Diagrams

Page 7ADJUSTING BREW VOLUMESCAUTION - Disconnect the power source from the brewer prior to the removal of any panel for the replacementor adjustment o

Strona 26 - W/SWEETENER

Page 8OPERATING CONTROLSA. ON/OFF SwitchON - Placing the switch in the left position allows the start switch to activate a timed brew cycle for three

Strona 27 - SCHEMATIC WIRING DIAGRAM

Page 937236 080504TEA BREWING1. Begin each brew cycle with a clean empty brew funnel and server. (Be sure the server lid doesn’t interferewith the fl

Komentarze do niniejszej Instrukcji

Brak uwag